← Back to home

Document DOJ-OGR-00015772

AI Analysis

Summary: This document is a maintenance checklist to be completed by March 28th, detailing various tasks such as checking faucets, cleaning range hood fans, and lubricating hinges. It was signed on February 14, 2005, indicating when the maintenance cycle began. The checklist is designed to be completed every three months.
Significance: This document appears to be a routine maintenance checklist for a residential or commercial property, highlighting the importance of regular upkeep to prevent damage and ensure functionality.
Key Topics: Maintenance tasks Appliance upkeep Home repair
Key People:
  • Unknown - Person responsible for maintenance

Full Text

CHECK EVERY THREE MONTHS MARCH (Check list to be completed and signed by 28th March) Faucets - Check for leaking faucets. Replace washers if necessary. Bathtub drain assembly - Clean out debris; inspect rubber seal; replace if necessary. Shower drain assembly - Clean out debris and scrub strainer. Range hood fan - Clean grease filter. Dishwasher - Run the unit with a quart of white vinegar added to the tank. This removes any deposits left behind in the tub and helps keep the drain clear. Hinges and locks - Lubricate as needed. Awnings - Lower and clean. Check motor. DATE: 2/14/2005 SIGNATURE: